At the CHAS Health Administration Office, Pro Mechanical Services completed tenant improvements with general contractor Baker Construction, providing mechanical system modifications and DDC system integration from Trane and Honeywell.
Glen Dow Academy
Pro Mechanical Services does some of their best work in tight spaces! This Trane package unit being installed at Glen Dow Academy performs much more efficiently and is 2/3 the size of the unit being replaced. The new unit exceeds the Washington minimum efficiency...
Riverside Park Water Reclamation Facility
The City of Spokane is working on a major upgrade to its water reclamation facility that will add a new filtration system, commonly called the Next Level of Treatment, and will greatly improve the quality of effluent that is released to the Spokane River. The upgrade...
Northwest Museum of Arts and Culture
Pro Mechanical Services has been an outstanding partner for integrating our critical facility solutions. As with every museum, the MAC requires precise, high-performing climate control to preserve its treasures. But we also had a goal to reduce energy. With Pro’s full...
Grow Op Farms LLC
Grow Op Farms has a 100,000 square foot, state-of-the-art grow facility with 39 separate grow rooms, each requiring real time environmental controls and a continuous flow of electricity, 24/7. In this facility, it is critical to have ultimate control of environment...
Sacred Heart Catholic Parish
Sacred Heart Parish was built in 1969 without air conditioning, making summertime events uncomfortably warm. The original building was built around the HVAC system which made this project a challenge. The scope of work included demolition of their existing AHU,...
Nespelem Elementary School
The objective of the project for the Nespelem School District was to implement mechanical upgrades at the 31,000 square foot elementary school that would provide an efficient, low maintenance HVAC system for today and into the future. Pro Mechanical Services provided...
Highland Middle School
Pro Mechanical Services was in a unique position as a subcontractor for the new construction of Highland Middle School because of our extensive use of Building Information Modeling (BIM). By using BIM technology, we provided invaluable coordination between all...